<div> <table border='0' width='100%' cellspacing='0' cellpadding='0'> <tbody> <tr> <td> <h6><strong>Indira Paryavaran Bhawan </strong><strong>Ministry of Environment and Forest (MoEF)</strong></h6> </td> <td><a href='../detailed-case-studies-2/ipb-case-study/'><img class='alignnone' src='http://nzeb.edsglobal.com/wp-content/uploads/2015/07/vew-details-arrow.png' alt='View Details' width='28' height='28' /></a></td> </tr> </tbody> </table> <table border='0' width='100%' cellspacing='0' cellpadding='0'> <tbody> <tr> <td>Location</td> <td>New Delhi</td> <td colspan='2' rowspan='11'><img class=' alignright' src='/wp-content/uploads/2015/10/ipb.jpg' alt='' /></td> </tr> <tr> <td>Geographical Coordinates</td> <td>28° N, 77° E</td> </tr> <tr> <td>Occupancy Type</td> <td>Office (MoEF)</td> </tr> <tr> <td>Typology</td> <td>New Construction</td> </tr> <tr> <td>Climate Type</td> <td>Composite</td> </tr> <tr> <td>Project Area</td> <td>9565 m<sup>2</sup></td> </tr> <tr> <td>Grid Connectivity</td> <td>Grid connected</td> </tr> <tr> <td>EPI</td> <td>43.75 kWh/m<sup>2</sup>/yr</td> </tr> <tr> <td></td> <td></td> </tr> <tr> <td colspan='2'><strong>Renewable Energy Technologies</strong></td> </tr> <tr> <td>Solar PV System</td> <td>– 930 kW capacity</td> </tr> <tr> <td>Total Area</td> <td>6000 m<sup>2</sup></td> <td colspan='2'><strong>Actual generation on site (as on 25.01.2014)</strong></td> </tr> <tr> <td>Total Area of Panels</td> <td>4650 m<sup>2</sup></td> <td>Power supply to grid</td> <td>started on 19.11.2013</td> </tr> <tr> <td>No of Panels</td> <td>2,844</td> <td>Power generation achieved</td> <td>300 kWh(per day)</td> </tr> <tr> <td>Annual Energy Generation</td> <td>14.3 lakh unit</td> <td>Total generation</td> <td>2.0 kWh</td> </tr> </tbody> </table> </div> <p>

Disclaimer: Reference in this Web site to any specific commercial products, processes, or services, or the use of any trade, firm or corporation name is for the information and convenience of the site’s visitor’s, and does not constitute endorsement, recommendation, or favoring by the Ministry of Power, Government of India, or Bureau of Energy Efficiency, Ministry of Power, Government of India. Additionally, the views and opinions of authors expressed herein do not necessarily state or reflect those of the Ministry of Power, Government of India, or Bureau of Energy Efficiency, Ministry of Power, Government of India, and shall not be used for advertising or product endorsement purposes.